Sunday, July 10, 2011

Creating a New Platform for the Dental Clinic

The concrete truck arrived and parked ready to mix up the concrete.
The men pulled out the scoop for the concrete to flow down.
They swept the concrete into the right place on top of the builders metal bars which reinforce it.
They began to move the concrete so that it was evenly covering the pad.

After using a tool to add water and mix up the concrete they had removed most of the air from the concrete.  Then they completely smoothed the surface over.
Finally it was finished and the concrete truck could leave.  Now we just had to wait for the concrete to dry and harden.




2 comments:

  1. it looked good after it was finished.
    Liam

    ReplyDelete
  2. WOW! Room 13 looks like you had fun watching the builders do their job with hammers and tools.
    From Kody and Leane

    ReplyDelete